| 216 College – Roof replacement |
| Arts Union – Roof replacement 1910 section |
| Berg House – New flooring and exterior painting |
| Bird House – Create space for new hire, replace deck off kitchen |
| Campus – Backup generator |
| Campus – Metering utilities |
| Campus – Pavement repair |
| Chaney House – New flooring and exterior painting |
| Chapel – Roof replacement, new flooring, and repair trim/overhang |
| CMC 102 & 106 – Phase 2 renovation of SCIC |
| Cowling – Replace roof top a/c unit, new light fixtures (dance, gym, & tennis court) |
| Dow House – Exterior painting |
| Faculty Club Annex – Repair damaged exterior trim, stucco, re-arrange bathroom in 200E, and new flooring |
| Faculty Club Annex and Faculty Club – Fire alarm system upgrade |
| Farm House – Second floor bathroom flooring |
| Goodsell Observatory – Roof replacement and new office for ENTS |
| Hall House – Lounge flooring |
| Headley House – Deck repair |
| Hill House – Bathroom flooring, paint wood fire escape and porch |
| Hill of Three Oaks – Install irrigation system |
| Hoppin House – Exterior painting |
| Hulings – Reconfigure 303 conference room/workroom |
| Hulings Lab – Reconfigure office for new hire |
| Hulings – Reconfigure 313/315 and 318/320 offices for new hire |
| Huntington House – Reside, paint touch-up |
| Jewett House – Exterior painting |
| Johnson House – Repair trim, repaint stairway by Admissions |
| Knights Baseball Field – Improvements |
| Laird Hall – Roof replacement, DOC office flooring, and recoat front entry deck |
| Laird Stadium – Remodel press box, touch-up deck coating, replace west side windows |
| Laird Stadium – Restripe track, improvements for field events |
| Leighton – Update offices for new hire in 226, History, and Philosophy |
| Leighton 305 – Classroom renovation |
| Leighton Hall – Roof replacement and fire alarm system upgrade |
| Library – Roof replacement and third floor flooring |
| Mudd Hall – Computer lab flooring |
| Music & Drama Arena Theater – Replace sound equipment |
| Music & Drama – Art Gallery corridor and rotunda |
| Music & Drama Concert Hall – New stage doors, flooring in lobby/stairs |
| Music & Drama LL05 – Remove acoustic tile and paint walls |
| Music & Drama – Roof replacement, roof replacement, and repair deck leaks |
| Music Hall 215 & 319 – Install soundproofing in walls |
| Musser Hall – Complete refurbish and replace steam bundle in domestic hot water tank |
| Myers Hall – Add bedroom in Hall Director’s apt. and repair sidewalk/steps |
| Nourse Hall – Go through all radiation valves and repair deck coating |
| Nutting House – Seal basement wall |
| Olin 211B – Install outlets, compressed air spigot |
| Pollock House – Reside |
| Rec. Center – Roof replacement |
| Reynolds House – Repair porch |
| Sayles-Hill – Fire alarm system upgrade and replace concrete on exterior porch |
| Sayles-Hill – Mezzanine remodel and remodel 150 & 160 office space for CAO & ACT |
| Second & Division Street – Replace concrete and add landscape plantings |
| Severance Hall – ADA modifications, flooring in G21-22, repair deck coating, and replace windows |
| Scoville 200 – Update office for new hire |
| Village Apts – Flooring |
| Watson Hall – Roof replacement |
| West Gym – Replace lockers in women's locker room, men's locker room flooring, and replace steam coils |
| Whittier House Garage – Roof replacement |
| Willis Hall – Create offices for new hire in Educ. Studies & Political Science and water line repair |