Skip Navigation

Text Only/ Printer-Friendly

Carleton College

  • Home
  • Academics
  • Campus Life
  • Prospective Students
  • Alumni
  • Faculty & Staff
  • Students
  • Families

Fiscal Year 2008-2009 Projects

216 College – Roof replacement
Arts Union – Roof replacement 1910 section
Berg House – New flooring and exterior painting
Bird House – Create space for new hire, replace deck off kitchen
Campus – Backup generator
Campus – Metering utilities
Campus – Pavement repair
Chaney House – New flooring and exterior painting
Chapel – Roof replacement, new flooring, and repair trim/overhang
CMC 102 & 106 – Phase 2 renovation of SCIC
Cowling – Replace roof top a/c unit, new light fixtures (dance, gym, & tennis court)
Dow House – Exterior painting
Faculty Club Annex – Repair damaged exterior trim, stucco, re-arrange bathroom in 200E, and new flooring
Faculty Club Annex and Faculty Club – Fire alarm system upgrade
Farm House – Second floor bathroom flooring
Goodsell Observatory – Roof replacement and new office for ENTS
Hall House – Lounge flooring
Headley House – Deck repair
Hill House – Bathroom flooring, paint wood fire escape and porch
Hill of Three Oaks – Install irrigation system
Hoppin House – Exterior painting
Hulings – Reconfigure 303 conference room/workroom
Hulings Lab – Reconfigure office for new hire
Hulings – Reconfigure 313/315 and 318/320 offices for new hire
Huntington House – Reside, paint touch-up
Jewett House – Exterior painting
Johnson House – Repair trim, repaint stairway by Admissions
Knights Baseball Field – Improvements
Laird Hall – Roof replacement, DOC office flooring, and recoat front entry deck
Laird Stadium – Remodel press box, touch-up deck coating, replace west side windows
Laird Stadium – Restripe track, improvements for field events
Leighton – Update offices for new hire in 226, History, and Philosophy
Leighton 305 – Classroom renovation
Leighton Hall – Roof replacement and fire alarm system upgrade
Library – Roof replacement and third floor flooring
Mudd Hall – Computer lab flooring
Music & Drama Arena Theater – Replace sound equipment
Music & Drama – Art Gallery corridor and rotunda
Music & Drama Concert Hall – New stage doors, flooring in lobby/stairs
Music & Drama LL05 – Remove acoustic tile and paint walls
Music & Drama – Roof replacement, roof replacement, and repair deck leaks
Music Hall 215 & 319 – Install soundproofing in walls
Musser Hall – Complete refurbish and replace steam bundle in domestic hot water tank
Myers Hall – Add bedroom in Hall Director’s apt. and repair sidewalk/steps
Nourse Hall – Go through all radiation valves and repair deck coating
Nutting House – Seal basement wall
Olin 211B – Install outlets, compressed air spigot
Pollock House – Reside
Rec. Center – Roof replacement
Reynolds House – Repair porch
Sayles-Hill – Fire alarm system upgrade and replace concrete on exterior porch
Sayles-Hill – Mezzanine remodel and remodel 150 & 160 office space for CAO & ACT
Second & Division Street – Replace concrete and add landscape plantings
Severance Hall – ADA modifications, flooring in G21-22, repair deck coating, and replace windows
Scoville 200 – Update office for new hire
Village Apts – Flooring
Watson Hall – Roof replacement
West Gym – Replace lockers in women's locker room, men's locker room flooring, and replace steam coils
Whittier House Garage – Roof replacement
Willis Hall – Create offices for new hire in Educ. Studies & Political Science and water line repair